Port Washington WWTP

  • Pot Washington before

  • aeration basin crack

  • completed

  • walkway completed

Project Description

Port Washington WWTP Aeration Basin

Project Details

  • Client:City of Port Washington, WI
  • Challenge:Concrete walkway was cracking and deteriorating
  • Solution:Surface preparation and install a polyurethane deck coating