Steel Railway Bridges

Project Description

Steel Railway Bridges

Project Details

  • Client:Steel Railway Bridges
  • Challenge:Needed to protect new steel bridge with active track running along side the jobsite. Had to complete in two phases with a longitudinal joint running the length of deck.
  • Solution:Provide waterproofing and corrosion protection to bolted steel panel ballast pan.
  • Process:Sandblast, install joint and spray apply 80 mils of Bridge Deck Membrane with Bridge Preservation's joint system.